Boulter Camray 5 Service Manual

Browse online or download Service Manual for Water heaters & boilers Boulter Camray 5. Boulter Camray 5 Technical data [en] User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 57
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Installation & maintenance manual for
Camray 5 Combi External
Boilers
Heat is our Element
Health & Safety
INFORMATION FOR THE INSTALLER AND SERVICE ENGINEER.
Under the Consumer Protection Act 1987 and the Health and Safety at Work Act 1974, it is a requirement to
provide information on substances hazardous to health (COSHH Regulations 1988).
The Company takes every reasonable care to ensure that these products are designed and constructed to
meet these general safety requirements, when properly used and installed.
To fulfil this requirement products are comprehensively tested and examined before dispatch.
This appliance may contain some of the materials below.
When working on the appliance it is the Users/Engineers responsibility to ensure that any necessary personal
protective clothing or equipment is worn appropriate to parts that could be considered as being hazardous to
health and safety.
INSULATION &SEALS
Pa
g
e 1 of 57Installation & maintenance manual for Camra
y
5 Combi External Boilers
14/04/2005file://D:\PL61500\PL61500.htm
Page view 0
1 2 ... 57

Summary of Contents

Page 1 - Camray 5 Combi External

Installation & maintenance manual for Camray 5 Combi External Boilers Heat is our Element Health & Safety INFORMATION FOR THE INSTALLER AND

Page 2 - Contents

normal anticipated use. Heating and Hot Water If the Programme is set for Heating and Hot Water or the Summer/Winter switch is set to Winter: - a) The

Page 3

If the Burner fails to start, adopt the following procedure: -1) Check that there is oil in the tank and that the supply valve is open. 2) Check the p

Page 4 - Section 1- Users Guide

Fig 2a Page 08 2:2 HYDRAULIC CIRCUITS Page 12 of 57Installation & maintenance manual for Camray 5 Combi External Boilers14/04/2005file://D:\PL615

Page 5 - IMPORTANT SAFETY NOTES

2:3 COMMISSIONING The heating system must comply with the latest editions of British Standard 5410 and The Building Regulations. Please note: It is e

Page 6 - 1:4 CONNECTIONS

Page 09Section 3 - Technical data 3:1 LIQUID FUELS The Camray 5 COMBI Boiler will burn liquid fuels complying with BS2869 Part 2 1998 Class C2 specifi

Page 7 - 1:6 BOILER CONTROL PANEL

This appliance must be effectively earthed and connection to the supply must be through a double pole isolating switch fused 5 amp. The isolating swit

Page 8

Page 11 3:7 COMMISSIONING DATA 3:7.1 Class C2 Kerosene Oil 3:8 PERFORMANCE DATA Dynamic Inlet pressures / flow rates Model Output Riello R00 typeNo

Page 9

Page 12 Section 4 - Installation 4:1 STANDARDS & REGULATIONS Page 17 of 57Installation & maintenance manual for Camray 5 Combi External Boil

Page 10 - 1:9 FAILURE TO START

The installation of the Boiler must comply with latest edition of: -BS5410 Oil installations Part 1: under 44kW. BS5449 Forced circulation hot water c

Page 11 - Section 2 - Introduction

Fig 4.3 Page 13 4:4 THE HEARTH The Camray 5 Combi has a Hearth Temperature of less than 85°C. The Boiler requires a level hearth on which to stand wh

Page 12 - 2:2 HYDRAULIC CIRCUITS

Glass Rope, Mineral Wool, Insulation Pads, Ceramic Fibre, Fibre Glass Insulation.May be harmful if inhaled. May be irritating to the skin, eyes, nose

Page 13 - 2:4 SAFETY

4:6 SEALED SYSTEM DETAILS 12 litre Expansion Vessel 1. 12Ltr expansion vessel 7. Boiler heat exchanger2. Storage tank 8. 3 port motorised valve3. Pre

Page 14 - Section 3 - Technical data

The Expansion Vessel is suitable for systems with a static head of up to 5 metres (16.5ft) i.e. the vertical distance between Expansion Vessel and hig

Page 15 - 3:5 DIMENSIONS

8) Boiler Primary Heat Exchanger Insulated steel Heat Exchanger with combustion chamber and access cover at front for servicing. 9) Three Port Motoris

Page 16 - 3:8 PERFORMANCE DATA

Bidets : Subject to local Water Company regulations the supply of hot and cold mains water direct to a bidet ispermitted if it is of 'over-rim fl

Page 17 - Section 4 - Installation

Fig 4.9 4:10 AIR SUPPLY The air supply to the boiler is through the grilles on the casing panel door. 4:11 OIL STORAGE 4:11.1 Oil Tank Consideration

Page 18 - 4:3 SITING & POSITIONING

Tanks made from plastic are now available. These should be UV stabilised for protection against sunlight, andcoloured green. Plastic tanks do not need

Page 19 - 4:5 BOILER ARRANGEMENT

Ensure that the Burner Oil Pump is correctly set for 'Single Pipe' operation. (See 4:13.2). 4:12.4 Two Pipe System Fig 4.12c When the botto

Page 20 - 4:6 SEALED SYSTEM DETAILS

Fig 4.12 Page 19 Single pipe oil system - Tank outlet above burner Do not fit pump bypass to burner- see 4.9.2 Page 27 of 57Installation & mainte

Page 21

Table giving maximum pipe length in metresSingle pipe oil system - oil connections Items 1-5 supplied with boiler Fig.4.12b LH Fuel entry available

Page 22

Two pipe oil system - oil connections Items 1-5 supplied with boiler- see fig 4.12d Items 6-10 not supplied with boiler Fig.4.12d LH Fuel entry av

Page 23 - 4:9 FLUE EXHAUST

2:1 Introduction2:2 Hydraulic Circuits2:3 Commissioning2:4 SafetySECTION 3 - TECHNICAL DATA 3:1 Liquid Fuels 3:2 Boiler Technical Details3:3 Burner D

Page 24 - 4:11 OIL STORAGE

Schematic diagram fit both hose as shown in Fig 4.12cPage 21 Dearator oil system - Tank outlet below burner Fit pump bypass screw to burner Fig 4.12e

Page 25 - 4:12 OIL SUPPLY

Fig 4.12f Page 22 4:13 OIL BURNER The Burner makers' technical leaflet is supplied with this manual and provides supplementary information not i

Page 26

Fig 4.13a ONLY USE BYPASS SCREW FOR ALLEN KEY (2.5MM). DO NOT USE SLOTTED SCREW 4:13.2 Burner Pump for Single Pump System The burner is supplied set

Page 27 - Fig 4.12

Fig 4.13b Page 23 4:14 CONTROL PANEL The Control Panel is pre-wired and fitted to the Boiler ready for connection to the system wiring. For operation

Page 28

4:15 FUNCTIONAL FLOW DIAGRAMS Page 24 4:16 FITTING PROGRAMMER Page 34 of 57Installation & maintenance manual for Camray 5 Combi External Boilers

Page 29

IMPORTANT The electrical installation of the programmer must be carried out by a suitably qualified electrical engineer/installer. It is not recommen

Page 30

1) These instructions are ONLY for suitably qualified personnel. 2) When selecting a Programmer make sure that it is suitable for combi boiler applic

Page 31 - 4:13 OIL BURNER

completely, but the vacated hole must be blanked off.Page 26 Section 5 - Flues 5:1 POSITIONING THE BOILER Read Sections 5:2 & 5:3 Some combustion

Page 32 - Fig 4.13a

'Where the terminal is within 1m of any plastic material, such material should be shielded from the effects of the combustion products of the flu

Page 33 - 4:14 CONTROL PANEL

It is recommended that the relevant section of BS 5410 Part 1: latest edition is carefully read. 7:3 REPORTING It is recommended that you use a report

Page 34 - 4:16 FITTING PROGRAMMER

Page 01 Section 1- Users Guide 1:1 INTRODUCTION Thank you for choosing the Camray Combi manufactured in the UK by Boulter Buderus who are renowned oil

Page 35

7:7 EXPANSION VESSEL PRESSURE When the system water is heated, the pressure will rise above the Cold Fill setting. If the pressure reaches 2.5 bar whe

Page 36

Ensure that soldered connections on copper pipes have not been used. Is the size of the pipe adequate for the boiler rating? Are all joints leak pr

Page 37 - Section 5 - Flues

Is the flue connected and properly located? VENTILATION Are the air grilles in the casing panel door clear from obstruction? Is the flue adapter fi

Page 38 - Section 7 - Commissioning

connection, and replace burner. Set the boiler thermostat to between Summer and Winter positions, see Fig 1. Switch on the electric supply to the bo

Page 39

A boiler fired with Class C2 Oil should only require attention once a year.8:1.1 General Inspection With the Boiler operating, inspect for signs of un

Page 40 - EXPANSION VESSEL PRESSURE

Fit combined air bleed manifold and 0-300psi (0-20 bar) pressure gauge to the appropriate oil pump connection, and replace burner. Switch on the elect

Page 41

Fig 8.2a 8:3 BAFFLE ARRANGEMENT Page 46 of 57Installation & maintenance manual for Camray 5 Combi External Boilers14/04/2005file://D:\PL61500\PL6

Page 42

Fig 8.3a Page 35 8:4 HEATING SYSTEM During routine servicing, the system water should be "topped up" if necessary, using the Filling Loop w

Page 43 - Section 8 - Maintenance

pressure must be reduced. The Boiler and storage tank each have a drain to facilitate this. After replacing the relevant parts, refill the system as d

Page 44

supply switched on? Is the programmer (or Boiler Operating Switch) set to call for heat? Is the Boiler Thermostat set to the desired temperature? Is t

Page 45 - 8:2 AIR SHUTTER ADJUSTMENT

1:3 IMPORTANT SAFETY NOTES To obtain the best possible performance and trouble free operation from your Boiler, it is important that you read these i

Page 46 - 8:3 BAFFLE ARRANGEMENT

Flame instability. Check combustion setting and re-set if necessary. 4 Burner starts but will not light up. This can be due either to absence of oil o

Page 47

throughput or uneven and spray pattern. Technical Data). (b) at initial firing. Air in supply line. Purge at pump to remove. Blocked flue ways. Clean

Page 48 - Section 10 - Fault finding

Pages 40 to 43 10:3 FAULT FINDING SYSTEM SUMMER MODE (DHW ONLY) puffing, ignition cuts in intermittently. improperly adjusted or faulty nozzle or unsa

Page 49 - 10:2 FAULT FINDING CHART

Pages 44 and 45 10:4 FAULT FINDING SYSTEM SUMMER MODE (DHW & CH) Pages 45 and 46 Air trapped in boiler heat exchanger Bleed air from boiler heat e

Page 50

10.5 PARTS REPLACEMENT INSTRUCTIONS Note. Before attempting any parts replacement always isolate appliance from mains electricity supply. 1) To remove

Page 51

g) Remove both elbow fittings (9) h) Unscrew valve body from the storage tank i) Replace with new unit and reassemble in reverse order using jointing

Page 52

e) Reassemble in reverse order, reinstate cold mains supply and test correct functioning of flow switch Page 47 Manual Part No. PL61500 Issue No. 1 Da

Page 53

Heat is our Element Page 57 of 57Installation & maintenance manual for Camray 5 Combi External Boilers14/04/2005file://D:\PL61500\PL61500.htm

Page 54

If an engineer is not known, Boulter Buderus will be pleased to provide details of a commissioning and servicing engineer from their register. *The Oi

Page 55

1:6 BOILER CONTROL PANEL Fig 1 a Boiler Control Panel (see Fig 1a) 1. Boiler control thermostat 2. Hot water thermostat 3. Boiler overheat/limit ther

Page 56

1:6.2 Hot Water Tank Thermostat This thermostat controls the water temperature in the tank. Guidance on its use is given in Section 1:7 of this manual

Page 57 - Heat is our Element

Fig 1 b Page 05 1:7 OPERATING FEATURES AND INSTRUCTION 1:7.1 How does your Boiler work? Hot Water If the Programme is set for Hot Water only or Summe

Comments to this Manuals

No comments