Boulter Camray 5 User's Guide Page 2

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 1
INSULATION & SEALS
Glass Rope, Mineral Wool, Insulation Pads, Ceramic Fibre, Fibre Glass Insulation.
May be harmful if inhaled. May be irritating to the skin, eyes, nose or throat. When handling avoid inhalation
and contact with the skin or eyes. Use (disposable) gloves, face masks and eye protection.
A
fte
r
handling wash hands and other exposed parts. When disposing, reduce dust with water spray, ensure
parts are securely wrapped.
GLUES, SEALANTS & PAINT
Glues, Sealants and Paint are used in the product and present no known hazards when used in the manner
for which
they are intended.
KEROSENE & GAS OIL FUELS (MINERAL OILS)
1. The effect of mineral oils on the skin vary according to the duration of exposure.
2. The lighter fractions also remove the protective grease normally present on the surface of the skin
rendering the skin dry, liable to crack and more prone to damage caused by cuts and abrasions.
3. Skin rashes (oil Acne). Seek immediate medical attention for any rash, wart or sore developing on any part
of the body, particularly the scrotum.
4. Avoid as far as possible any skin contact with mineral oil or with clothing contaminated with mineral oil.
5. Never breath any mineral oil vapours. Do not fire the Burner in the open i.e. out of the Boiler as a miss fire
will cause unburnt oil vapours.
Barrier cream containing lanolin such as Rosalex Antisolv, is highly recommended together with a strict
routine of personal cleansing.
Under no circumstances should mineral oils be taken internally.
OFTEC Code of Practice OCP/1: 1995 For the Safe Installation, Commissioning, Maintenance and Fault
Rectification of Oil Firing Equipment should be consulted.
Boulter Buderus Limited
Magnet House, 30 White House Road, Ipswich IP1 5JA
Telephone: (01473) 241555
Fax: (01473) 241321
CONTENTS
SECTION 1 - USER GUIDE
SECTION 5
-
PRIMARY PIPE-WORK
1:1 Introduction 5:1 Pipe duct
1:2 Safety Notices 5:2 Flow and Return pipes
1:3 Installation &Commissioning 5:3
A
dditional Components
1:4 Boiler Control Panel
1:5
Operating Instructions
SECTION 6 - FLUES
1:5.1 Boiler Control Thermostat 6.1 Flue location
1:5:2 Boiler Overheat/Limit Thermostat 6.2 Terminal guard
1:5:3
Lockout Indicator 6.3 Boiler position
1:5:4
Starting your Boiler
1:5:5 Switching off Temporarily
SECTION 7 - COMMISSIONING
1:5:6 Shutting Off for Summer 7:1 Commissioning
1:5:7 Sealed System Central Heating 7:2 Responsibility
Pa
g
e 2 of 40Camra
y
5 External Boilers
14/04/2005file://D:\PL61000\PL61000.htm
Page view 1
1 2 3 4 5 6 7 ... 39 40

Comments to this Manuals

No comments